Basin and Drainage Line Installed
The first steps in installing the TripleSafe are create a space in the floor for the sump pump, placing the large basin inside and affixing the drainage lines accordingly.
TripleSafe Stands
Pump stands are placed at the bottom of the basin to keep the pumps out of silt and sediment, preventing clogs.
Three Pumps Put In
Next, the Zoeller cast-iron pumps are placed and attached to the drainage lines. These include a 1/2, 1/3 HP and battery backup pumps!
Final Product
The TripleSafe is now ready to protect this homeowner's biggest investment!